Description
Rehabilitation (Design and Construct) of Road D528 From Haenertsburg to Tzaneen in The Mopani District Of Limpopo Province
EXECUTED SCOPE OF WORKS
The final measured work for the main scope of works is as follows:
Patchworks 1 142.83m²
Overlaying 33 037.93m²
Re-Cycling 5 750.00m²
Road signs
Warning signs, Triangular 1220mm 20 No
Rectangular chevron (610mm x 150mm) 200 No
Rectangular chevron (600mm x 600mm) 45 No
Road markings
White lines (broken or unbroken) 3.12 km
Yellow lines (broken or unbroken) 6.18 km
Road studs 130 No.